Seven steps, one team, no hand-offs to strangers. Here is exactly what happens from your first call to the day your line, substation or plant is energised.
Share the scope of work, location, drawings or tender / work-order details. We fix a time to discuss and visit the site.
You: a short call
Our engineers study the site β route and crossings for lines, layout and soil for substations and civil works, shadow and structure for solar.
Engineers: on site
We prepare the execution plan: drawings, bill of quantities, materials with specifications and a milestone schedule β agreed with you in writing.
You: review and approve
Materials from approved makes are ordered and inspected, and the permissions, shutdowns and right-of-way needed for the work are coordinated.
Us: materials and coordination
Our crews execute foundations, tower or structure erection, stringing, equipment installation and cabling β with daily safety briefings and supervision.
Crew: on site daily
Pre-commissioning tests are carried out and recorded; we support inspection and energisation along with the client and the utility.
Us: tests and inspection
You receive as-built details, test reports and warranty documents β and one number to call for maintenance and support.
Us: one call away
The standards our crews follow on every site β from a short HT line to a full substation.
PPE, permits, shutdown coordination and work-zone earthing on every site.
Materials of specified make and rating, inspected before use β with test certificates handed to you.
A written schedule with milestones, and regular progress updates until handover.